Boom lift, 29 m, 100 kg lighter
29 m came from counting the boom's own weight first, no extra material was needed.
Read the caseEvery enquiry answered within 24 hours
| What the part is | Route | Where the line stops |
|---|---|---|
| Closed three-dimensional shell (an enclosure or housing) — inserts to bury, both faces seen | HP-RTM | A steel mould and high-pressure injection add up to heavy spend; a shape change is a new mould |
| Semi-structural part with ribs, bosses and inserts | Compression moulding (prepreg or wet) | Flow length is limited; a deep cavity and a large flat face are hard to serve together |
| Body of revolution, closed section | Filament winding | The surface is mandrel or machined, and will not pass as an appearance face |
| Section that does not change along its length | Pultrusion | The section cannot vary; transverse strength is below axial |
| High volume, high integration, thermoplastic | LFT-D | Fibre length stops short of continuous; a thin wall over a long flow path is out |
The part types we see most are enclosures, housings and box-type parts. They have curvature on the outside, something to fit inside, inserts to bury and a seal face to hold. They go to HP-RTM or compression moulding, and both faces can be delivered as appearance faces. Constant-section tube, rod and profile go to pultrusion; bodies of revolution go to winding.
Cutting ±0.01 mm, hole positions ±0.01 mm, CNC edge milling ±0.2 mm. These three are commitments: they go into the quotation.
Moulding tolerance differs from line to line. Move a part from one line to another and the tolerance moves with it, so it is quoted per part.
What inspection can show: CMM reports; void content and fibre volume fraction by ultrasonic or section microscopy; insert pull-out force; a retained sample from every batch. Where flame retardance is required, a type test can go to a third party.
The tool is quoted through a toolmaker; the cost and the ownership are both yours.
The sequence. Tooling is paid for, a sample is made, the sample is signed off, the first production run follows. Volume runs after that first run is signed off. Change the drawing between sample and first run and it is the tool that changes, so it costs more the later it comes.
Batch size is agreed per project; there is no catalogue minimum.
Lead time is agreed per project.
With all three, the first quote is the quote. Where something is missing we ask — we would rather ask than send a price that comes back for revision.
A carbon weave on the visible face, an injection-moulded rib structure on the back, made in one shot. No secondary bonding, and no second tool just for the weave. Datum comes from the assembly sequence; the cosmetic face is settled in the tool, not by polishing afterwards.
Parts we have made: carbon fibre interior trim, one part in two materials ; for body structure see composite body panels for vehicles.
Parts that do not belong in a catalogue
A drawing, a photo of a failed part, or three lines of requirement is enough to start. Scope, price indication and lead time within 24 hours.
No commitment · NDA available · Reply within 24 hours