Design & engineering

The cost is settled on the drawing.

Design and build in one team means something specific, and it is not a slogan: the people who draw, the people who cut the mould and the people who run the part are the same team. Production is in the room from the first day — see a parting line that will not work and say so; see an insert that will not go in and change it there.

The team includes former structural engineers from Airbus and Vestas.

Consumer and industrial structures and appearance parts. Not aircraft assemblies, defence or wind blades. Design and build sit in one team, on in-house CAE and 3D design.

Request a quote

Design and manufacturing are not split

The design house issues a drawing, the factory builds to it. In between sit a quote, a clarification round and a "we cannot make that". We keep the three groups in one building.

Design

Structure, lay-up, strength, drawings

Process

Route, tooling concept, tolerance allocation

Inspection

Dimensions, material lots, sample tests

The people who design know what each line can do HP-RTM, compression moulding, winding, pultrusion, LFT-D — how deep a moulding can draw, how fine a winding can go, which section a die can open, whether a preform will fit inside. That is not read out of a book; it is learned on the line.

Production joins at the design review Mould, process and finishing people are in every review. They only need three sentences: this parting line cannot be made, this insert will not go in, this face cannot be reached for finishing. Said in the room, changed in the room — not after the drawing is issued.

Cost can be counted at design stage A part's price is three things: mould amortisation, cycle time, finishing. All three are essentially fixed on the drawing. Simplify the split, drop an operation, raise material yield, and the cost comes down. Squeeze the supplier once the drawing is frozen and what comes off is someone else's margin.

Which is why we can quote at concept stage: the price is a by-product of the design rather than a guess.

The duty goes in, the part comes out

What arrives is usually not a drawing. It is a duty, or a part already in service. Specifications rarely say that someone will stand on the part; the real cause is usually a move on site that nobody wrote down.

  • Load and direction where the force comes from, and where it goes
  • Load type and frequency one pull to break, repeated cycles or an impact; and whether it will resonate with the structure
  • Travel and envelope how far it moves, what else is around it
  • Temperature normal, peak, and how fast it cycles
  • Media water, oil, detergent, salt spray, acid or alkali, and for how long
  • Ingress protection water or dust; wash-down or immersion
  • Interfaces hole pattern, mounting face, bolt sizes, assembly sequence
  • Volume and cycle how many a year, and when they are due
  • Surface appearance face or structural face, colour, weave
  • Validation and regulation whose outline, and who reads the report

Miss one and that one is designed to the most conservative assumption. Conservative is not safe — it is weight and piece price, together.

What goes out is a set that can start work — 3D model and drawings, ply schedule, tooling concept, process route, validation items, quote. Not a render.

What we design

Eight things, each of which moves weight, cost or yield directly.

01

Structure

Laminate, wall, ribs, inserts, joints. Load path first, geometry second — reverse that order and everything is rework.

02

Lay-up

Material, angle and sequence for every ply. Re-stack the same plate and weight or cost can move 20%. Where the wall steps down, it steps down ply by ply; a step that breaks on one line is where the crack starts.

03

Strength

Static, fatigue, buckling, modes, bond lines. Hand calculations and FEA where the geometry is complex; key assumptions checked on a sample.

04

Process and tooling

HP-RTM, compression moulding, winding, pultrusion, LFT-D and machining: six routes. Which one holds the tolerance at your volume decides it.

05

Tolerance stack

What the mould holds, what machining holds, where a datum replaces a tighter tolerance. Tighten the wrong link and tooling cost doubles.

06

Weight

Topology, size optimisation, material substitution. Take it where it pays, leave it where it does not.

07

Appearance

Class A surface, weave direction, colour match, orange peel. A cosmetic part is judged by different rules than a structural one.

08

Validation

DIC, strain gauges, rig tests, failure reproduction. What we have not calculated, we do not imply we have.

Where a tolerance, a volume or a geometry is outside what the plant can hold, we say so at review, not after the quotation. No number appears in a quotation that we cannot hold.

What we do not do

No whole-machine assembly, no electronic controls.

We do not build aircraft assemblies, defence equipment or wind blades. The team has built all three; our product scope does not include them.

No design without a duty. Given a shape and no duty, the only possible answer is the conservative one — the weight stays up, and so does the price.

FAQ

Are design and manufacturing the same people?

Yes. Drawings, ply schedule, tooling concept and process route come from one team, and the mould, process and finishing people sit in the design reviews. It does not end when the drawing is issued.

Can you do design only, without the parts? How is the design fee worked out?

Yes. The design fee is quoted per project and split by work package and validation items; tooling and series production are quoted separately. If the parts come with it, there is one handover less.

Do you sign an NDA?

Yes. Drawings, models and samples are handled under it, and samples can be kept from circulation by agreement. The terms come with the quotation.

Who owns the design?

The customer pays for it, so drawings, ply schedule and model are the customer's.

Can you keep our existing interfaces?

Yes. Hole pattern, mounting face and bolt sizes carry over, the lay-up is recalculated for the new duty. The area around the interface is thickened. Mounting holes are moulded in; holes and threads that need machining are quoted separately.

How much weight can come out?

Per part. Weight is what is left after the stiffness calculation; set a weight target first and you pay for it in stiffness.

How long to a concept?

Per project. With the duty complete the concept comes quickly; where the duty still has to be established, one round of duty definition comes first.

Send the drawing. We will send the route.

A drawing, a photo of a failed part, or three lines of requirement is enough to start. Scope, price indication and lead time within 24 hours.

No commitment · NDA available · Reply within 24 hours

Request a quote WhatsApp